I think I'm finally ready to start putting down the wood. In the den and foyer, I had to patch quite a bit of the floor, probably around half of it. I over poured a few places, and feathered it out with a 12" finish trowel.
To really smooth things out, I tried using my 4" razor scraper to make it level to the existing concrete, in one spot. The levelor was a little sandy-ish after I scraped the top off. Does that sound like a problem? I mixed the levelor up a little on the thin side, because I was filling such shallow holes.
I'm guessing I'll not scrape anymore. The un-scraped areas seem really solid.
Any things I need to think about before I glue down the first board? I'm going to measure from distances between walls in several locations to try and find a center that minimizes problems. I don't know off square the walls are yet.
The longest run goes goes from den to foyer to living room, each room is between 15-17' wide.
Order will soon be restored to the house...
To really smooth things out, I tried using my 4" razor scraper to make it level to the existing concrete, in one spot. The levelor was a little sandy-ish after I scraped the top off. Does that sound like a problem? I mixed the levelor up a little on the thin side, because I was filling such shallow holes.
I'm guessing I'll not scrape anymore. The un-scraped areas seem really solid.
Any things I need to think about before I glue down the first board? I'm going to measure from distances between walls in several locations to try and find a center that minimizes problems. I don't know off square the walls are yet.
The longest run goes goes from den to foyer to living room, each room is between 15-17' wide.
Order will soon be restored to the house...